Our Work
A selection of representative projects demonstrating KB Compliance's capabilities across hydrographic surveying, UAV mapping, environmental compliance, and quality control management.
St. Bernard Parish, Louisiana
Client: Louisiana Coastal Protection and Restoration Authority (CPRA)
Over the four year lifespan of the project handled pre, interim and post hydrographic and land surveys restoring 2,770 acres of marshland placing 15,161,709 cubic yards of material supporting 4 dredges.
Theodore, Alabama
Client: Mobile Bay National Estuary Program
High-resolution, survey-grade aerial mapping utilizing Real-Time Kinematic (RTK) workflows, Ground Control Points (GCPs), digital as-built generations and aerial videography.
Panama City, Florida
Client: Florida Department of Environmental Protection & Bay County Tourist Development Council
Turbidity Monitoring: Gathered turbidity samples matching dredging cycles using fully calibrated multi-depth testing devices measuring NTUs in deep water via boat, as well as shallow surf zones inaccessible by vessel. Maintained compliance reporting to satisfy USACE and state environmental regulations.
Bird Monitoring: Expert identification of breeding, nesting, and territorial behaviors of sensitive and protected Gulf Coast shorebirds. Established protective buffers, manage regulatory signage, and file compliant reporting to prevent costly project shutdowns while keeping work moving.
Eastpoint, Florida
Client: Franklin County, Florida & U.S. Army Corps of Engineers
Certified daily quality control oversight, daily QC reporting, and seamless communication with Quality Assurance. Performed quality control management working with the Corps of Engineers and contractors to ensure all quality control standards on Eastpoint Dredge project. Enforced USACE Construction Quality Management standards across the dredging footprint.
Project details above are placeholder content — ready to be updated with KB Compliance's real project history.
Service Area
KB Compliance operates across the Gulf Coast region — from the Texas shoreline through Louisiana, Mississippi, Alabama, and the Florida Panhandle. We mobilize quickly and know the waterways, regulations, and agencies in each state.
Louisiana
Primary operating base — coastal, marsh, and inland waterway projects statewide
Mississippi
Gulf Coast shoreline, Sound, and river system projects
Texas
Gulf Coast and Intracoastal Waterway corridor projects
Alabama
Mobile Bay and coastal waterway projects
Florida Panhandle
Northwest Florida Gulf Coast projects
Tell us about your scope and we'll put together a tailored approach. Fast response, no obligation.
Start a Conversation